Planning a New Factory? Seven Financial Numbers to Test Before Seeking Funding

A factory proposal needs more than a machinery quotation and a sales target. Before approaching banks or investors, build seven connected measures that explain the full funding requirement and the project’s ability to sustain itself.

Generic office building, illustrating business funding and planning

Image: Side of office building by Alanthebox; CC0 1.0. Unmodified, illustrative photograph.

The seven measures

  1. Total completion cost: land and development, buildings, equipment, installation, pre-operative costs, financing costs and contingency, as applicable. Identify exclusions and avoid double counting.
  2. Promoter funds available: distinguish cash already committed from hoped-for asset sales or future profits. Reconcile the source and date of each contribution.
  3. Capacity utilisation: estimate the ramp-up by period using production constraints and demand evidence. Installed capacity is not guaranteed saleable output.
  4. Contribution margin: test selling prices against variable production and distribution costs. Identify sensitivity to materials, energy and product mix.
  5. Break-even level: calculate the volume or revenue needed to cover the relevant cost base. State whether the measure is operating, cash or accounting break-even.
  6. Working-capital requirement: model stock, customer credit and supplier terms. Growth can increase the funding gap even when reported margins improve.
  7. Debt-service coverage: compare the cash measure agreed with the lender against scheduled interest and principal. Examine weak periods as well as the average.

Make the numbers reconcile

The production plan should drive sales, raw-material purchases and staffing. The expenditure schedule should drive drawdowns and financing costs. Changes in working capital should flow into cash, not remain in a separate unconnected schedule.

Use base and downside cases. For example, a commissioning delay may simultaneously postpone revenue, increase interest and extend overhead expenditure. Modelling only one effect understates the risk.

Support the model with evidence

Retain quotations, approvals, land documents, customer evidence and the assumptions behind estimates. RBI’s current project-finance requirements and the lender’s appraisal policy determine the applicable checks; these seven measures are a preparation framework, not an exhaustive statutory checklist.

An independent technical or viability review, where required or commissioned, should challenge the assumptions. Its report does not guarantee lending approval or commercial success. Management remains responsible for presenting a coherent, supportable plan.

Connect with Monei Matters

Bring your factory budget and operating assumptions to Monei Matters for a project-finance preparation discussion.

Monei Matters
B-9, Near City Centre Market, Ramprastha, Ghaziabad, Uttar Pradesh 201011
Phone: +91 93138 03227 / +91 93110 03227
Website: www.moneimatters.com

Services include business finance, working capital, commercial mortgage/LAP, lease rental discounting, debt syndication, restructuring, settlements, FDI advisory and equity syndication.

Disclaimer

General information based on sources reviewed for the position as at 10 September 2026; not transaction-specific legal, tax or investment advice. Illustrations are hypothetical. Applicable law, documents and lender or investor terms govern each case; funding and settlement outcomes are not guaranteed.

Sources

Comments

Popular posts from this blog

iDEX Grant Is Not a Purchase Order: An MSME Cash Test

Some precautionary tips before taking working capital finance from any bank are:

One Time Loan Settlements precautions and Monei Matters.